このエントリーをはてなブックマークに追加
ID 19618
JaLCDOI
Sort Key
9
FullText URL
Author
Fujihara Yutaka
Osaki, Hirokazu
Abstract
In this paper, we propose a method to solve simultaneously facility layout problem and scheduling problem. About a initial random layout planning, the production scheduling and the transportation scheduling of AGV are obtained by using priority rules. From the obtained transportation scheduling, the critical transportation and the closeness rating are obtained. Facility layout is renewed by the combined procedure of genetic algorithm and tabu search in order to reduce the material handling cost. By using this renewed facility layout, the production scheduling and the transportation scheduling of AGV are also revised until no further improvement is possible.
Publication Title
Memoirs of the Faculty of Engineering, Okayama University
Published Date
1998-11-30
Volume
volume33
Issue
issue1
Publisher
Faculty of Engineering, Okayama University
Publisher Alternative
岡山大学工学部
Start Page
59
End Page
64
ISSN
0475-0071
NCID
AA10699856
Content Type
Departmental Bulletin Paper
OAI-PMH Set
岡山大学
language
English
File Version
publisher
NAID
Eprints Journal Name
mfe