このエントリーをはてなブックマークに追加
ID 15829
JaLCDOI
Sort Key
4
FullText URL
Author
Akagi Fumio
Osaki Hirokazu
Abstract
Assembly line balancing is to assign work elements to serial work stations so as to make the work content at each station as close as possible to one limiting cycle time or pitch time, i.e., an upper time limit over every station. Until now, it is usually assumed that the performance rates of work stations are constant. But in practice the performance abilities of workers, machines or robots are varied by their own working conditions. Then the actual station times are different from standard ones, and consequently the line balance may diminish in many cases. Therefore in this paper, we propose an improved balancing method, in which work elements can be assigned to the work station having the upper time limit changed by its performance rate or ability. Further we develop the computer program of the proposed method and provide an illustrative problem and computational results. In an application of our method to the practical problems, it is shown that the actual efficiency of the production line becomes near that planned.
Publication Title
Memoirs of the School of Engineering, Okayama University
Published Date
1986-11-15
Volume
volume21
Issue
issue1
Publisher
岡山大学工学部
Publisher Alternative
School of Engineering, Okayama University
Start Page
17
End Page
30
ISSN
0475-0071
NCID
AA00733903
Content Type
Departmental Bulletin Paper
OAI-PMH Set
岡山大学
language
English
File Version
publisher
NAID
Eprints Journal Name
mfe