With the increase of underground construction in metropolitan areas in recent years, the problem of associated earth retaining works cutting off the natural flow of groundwater has increased in both scale and extent. The authors are proposing a new diaphragm wall method that does not inhibit the flow of groundwater. This paper describes the verification of the detour permeation achieved by the new diaphragm wall method and the experimental results related to the blockage of this groundwater flow.