このエントリーをはてなブックマークに追加
ID 47023
JaLCDOI
Sort Key
4
FullText URL
Author
Ohtani, Ryuji
Konishi, Masami
Nishi, Tatsushi
Abstract
In this paper, we studied a planning and scheduling of production system considering demand changes. In the proposed system, planning part determines lot-size and amount of jobs in production. On the other hand, scheduling part determines the production sequence of jobs. In order to treat with the demand changes, both planning and scheduling should work well simultaneously. In the proposed system, preset and real time production control system is newly constructed from the view point of adaptive control. In the system, production planning is modified when the difference between production amount and demand becomes large. Moreover, production schedule is regenerated when the determined schedule is deviated from the prospected one. The scheduling system is characterized as the autonomous decentralized optimization system where each job works as agent and agent searches its appropriate starting time of processing. The effectiveness of the proposed system is confirmed by numerical examples.
Publication Title
Memoirs of the Faculty of Engineering, Okayama University
Published Date
2002-03
Volume
volume36
Issue
issue2
Publisher
Faculty of Engineering, Okayama University
Start Page
15
End Page
42
ISSN
0475-0071
NCID
AA10699856
Content Type
Departmental Bulletin Paper
OAI-PMH Set
岡山大学
language
English
File Version
publisher
NAID
Eprints Journal Name
mfe